The operations for Stena Forth in Egypt are due to commence in 2023 upon completion of existing contractual commitments. The Shell exploration project will entail 3 well drills in the Mediterranean. The project will require Managed Pressure Drilling (MPD) utilising the system owned and installed by Stena Drilling on the Stena Forth.